The Dover Farm Wetland Mitigation Bank is a 966-acre ecological restoration project located along the west side of the Dismal Swamp Canal in Chesapeake, Virginia. Established in 2008, the site sits adjacent to the Great Dismal Swamp National Wildlife Refuge. Located within a connected corridor of protected conservation lands, Dover Farm reflects RES' long-term commitment to high-quality restoration, monitoring, and stewardship.
A recently approved MBI modification has expanded the service area to include the Lower James (HUC 02080208). The approved service area now includes primary HUCs 03010205, 03010203, and 02080208, with secondary coverage in 03010202, 03010201, and 03010204, providing project teams with greater flexibility across the watershed.
The bank breaks down into roughly 243 acres of wetland preservation, 686 acres of wetland restoration, and 33 acres of upland. Before restoration began, the property had been farmed for years, right up until 2009. The work included filling in old internal ditches using material from a leftover on-site airfield, building a water control structure in the northeast corner, and planting around 200,000 trees to reestablish native vegetation.
Dover Farm is designed to offset unavoidable wetland impacts in the Chesapeake Bay watershed. By restoring and protecting these wetlands, the project improves water quality and supports a mix of habitats, including bottomland hardwood forests, marshes, riparian zones, and wetlands, providing a healthy environment for wildlife such as the canebrake rattlesnake.
In 2019, the bank reached its Year 10 monitoring milestone, an assessment of long-term ecological success and environmental compliance. A decade in, and now with an expanded reach, Dover Farm stands as a strong example of what large-scale wetland restoration can do for the Chesapeake Bay region.
- Environmental Mitigation (48)
- Video (47)
- Natural Resource Restoration (37)
- Landscape-scale Restoration (34)
- Article (33)
- Species & Habitats (31)
- Water Quality (24)
- Resiliency (22)
- Texas (17)
- Virginia (16)
- California (15)
- Pennsylvania (15)
- Technology & Innovation (13)
- Regulatory (12)
- Water Quantity (11)
- Klamath (10)
- Research (10)
- Louisiana (9)
- Oregon (9)
- Procurement (9)
- Storymap (9)
- Florida (6)
- Presentation (6)
- Case Studies (5)
- Jon Kasitz (5)
- Nature-based Solutions (5)
- Bob Siegfried (4)
- Coastal Resiliency (4)
- Maryland (4)
- Corporate Sustainability (3)
- Dam Removal (3)
- Ecological Site Solutions (3)
- Large-scale Development (3)
- Mary Szafraniec (3)
- North Carolina (3)
- Studies & Reports (3)
- Urban Renewal (3)
- Bois Darc (2)
- Dylan Keel (2)
- Economic Development (2)
- Environmental Restoration (2)
- Federal (2)
- Flooding (2)
- Georgia (2)
- Illinois (2)
- Indiana (2)
- Justin Freedman (2)
- Matt Stahman (2)
- Milwaukee (2)
- Mine Reclamation (2)
- Mitigation credits (2)
- Podcast Audio (2)
- South Carolina (2)
- Tennessee (2)
- Webinar (2)
- Wisconsin (2)
- Alabama (1)
- Bailey Wilfong (1)
- Brandon Hall (1)
- Caitlin Burke (1)
- Carpentersville Dam (1)
- Conservation Bank (1)
- Data Centers (1)
- Desmond Duke (1)
- Innovation Leadership Program (1)
- Kathy Hoverman (1)
- Larsen McBride (1)
- Michigan (1)
- New York (1)
- North Dakota (1)
- Ohio (1)
- Patrick Daniels (1)
- Paul Braun (1)
- Robin Bedenbaugh (1)
- Solar (1)
- Stormwater Management (1)
- Suburban Chicago (1)
- Tree Planting (1)
- Volumetric Water Benefits (1)
- Water Stewardship (1)
- Wesley Hayes (1)
- West Virginia (1)
- July 2026 (5)
- June 2026 (3)
- May 2026 (2)
- April 2026 (4)
- March 2026 (1)
- February 2026 (3)
- January 2026 (2)
- December 2025 (1)
- November 2025 (1)
- September 2025 (2)
- August 2025 (3)
- June 2025 (1)
- May 2025 (3)
- March 2025 (3)
- February 2025 (2)
- January 2025 (20)
- December 2024 (10)
- November 2024 (31)
- October 2024 (7)
- August 2024 (2)